|
|
The robot takes the moulded plastic part and puts it into the equipment, where the insertion points are sheared. At this phase also the four feet are inserted in the part. Afterwards the robot takes the part and puts it on the conveyor belt.
|
|
The operator controls the part and puts it into a further equipment that screws the shock absorbers and controls the screws tightening of the shock absorbers and also cheks that the four feet have been inserted properly. |